The Drain Commissioner is assessing $20,500 over 1 year.
The #789 Shepard & Extension was last assessed in 2015.
Work Completed
• Inspection for brush spraying in 2016
• Log removal from bridge crossings in 2016
• Inspection of downstream portion of the drain in 2017
• Fallen tree removal in 2019 (Lloyd’s Excavating)
• Problem report of erosion in 2020
• Fallen tree removal in 2020 (Lloyd’s Excavating)
• Cleanout and realignment work in 2021 (Lloyd’s Excavating)
• Removal of trees/logs at CIS Trail bridge in 2022
• Brush spraying in 2022 (Stoney Creek Outdoor)
• Problem Report response in 2023, tree down
• Removal of trees/logs at CIS Trail bridge in 2023 (Wombat Services)