The Drain Commissioner is assessing $3,000 over 1 year.
The #659 Mogg was last assessed in 2014.
Work Completed
• Brush spraying in 2015 (CCDC Staff)
• Brush spraying inspection in 2016
• Problem report response in 2019
• Meeting with landowner about tiling into the drain in 2022
• Inquiry from landowner about enclosing a portion of the drain with tile in 2023