The Drain Commissioner is assessing $5,000 over 1 year. 

The #964 Meadowbrook was last assessed in 2016. 


Work Completed

• Inspection of outlet structure in 2017

• Problem report response and catch basin repair in 2018

• Inspection after heavy rain event in 2019

• Tree removal work in detention basin in 2020

• Problem report response in 2021

• Obstruction removal in outlet structure in 2021

• Meeting regarding Lake Lansing in 2022

• Problem report response – filling of west detention basin in 2022

• Detention basin maintenance in 2023