The Drain Commissioner is assessing $16,000 over 1 year.
The #811 Smith & Sutton was last assessed in 2006.
Work Completed
• Problem report response in 2008 & 2009
• Surface inlet repair work in 2010 (Lloyd’s Excavating)
• Heavy rain inspections in 2014
• Brush spraying in 2014 (CCDC Staff)
• Fallen tree removal in 2014 (Smith Lawnscapes)
• Report of fallen trees in 2020
• Problem report response in 2022 (severe erosion)
• Erosion repair an tree clearing in 2022 (Wombat Services)
• Channel cleanout work south of Townsend Road in 2022 (Lloyd’s Excavating)